In 1998 Meili Construction built the Autzen Skyboxes on the University of Oregon campus — a project that consisted of 10 skyboxes and 600 additional seats. This was a publicly-funded project with a tight schedule and limited access.
This project was built over the existing public bathrooms (which were not remodeled) on the North side of the stadium. This structure is a 3 story building with restrooms, concession stands, an elevator, and a combination of pre-cast concrete and structural steel. Each skybox contains a kitchen, dining area, 2 rows of seating, a private bathroom, and closed circuit TV.
Project Details:
Project Completed: 1998
Area: 10 New Skyboxes, 600 additional seats
Owner: University of Oregon
10 Van Buren Street
Eugene, OR 97402
541.485.1417
CCB# 63771